The outside of the building is comprised of ceramic panels, aluminium glass and wood.
The building has a reinforced concrete frame, with a vibration strategy to mitigate the effects of structure-borne vibration to a level acceptable to the building end users and their associated equipment.
The centre is also being designed with flexibility in mind to ensure the building adapts to future needs. Construction started in 2023 with full transition to be completed in 2027.
The building is targeted to achieve “Excellent” in BREEAM assessment, with an aspiration to utilise a high level of cement replacement and recycled aggregate where possible to reduce embodied carbon within the structure.