Îlot Libération

Balma, France
Project management
Town of Balma
Architect
Véronique Joffre
Cost
4,550 M€
Area
2 558 m²
Year
2014
Our mission
Structural & façade engineering design

Town centre redevelopment, place de la Libération in Balma, construction of a multifunctional building comprising retail space and a music school with an auditorium.
Reinforced concrete structure with curtain walls and floors cast in situ or using prestressed pre-slabs. The curtain walls are insulated externally with brick cladding. The facade piers and pillars are built of loadbearing bricks. Flat concrete roof with weatherproofing and insulation protected by concrete slabs or vegetation. Auditorium roof of steel roof decks laid on steel beams.