This performance has been achieved thanks to the range of measures introduced as part of the project, including:
– Replacing the envelope and improving its performance;
– Installing solar shades, reducing energy needs by 40% on office floors;
– Replacing production and ventilation systems, opting for a mix of urban networks and geothermal energy;
– Motorised openings, controlled by the building management system, allowing night-time cooling in summertime;
– Installing an adiabatic cooling module on office air conditioning units.