Symbiose

Bagneux, France
Project management
HRO
Architect
Arte Charpentier Architectes
Cost
n/c
Area
53 000 m²
Year
2022
Our mission
Structural Engineering

The project consists of the construction of an 8-storey building complex comprising 2 buildings (to be considered independent) for use as offices above a lower ground floor and 3 basement parking levels. Terrell is responsible for a structural assignment comprising the preliminary design of the main structure of the buildings as well as monitoring the works in the role of Technical Assistant to the Developer during the execution phase. This ambitious project seeks to achieve the following certifications:
-Association for High Environmental Quality in Construction: Exceptional;
-BREEAM Excellent.

1/2